Measure first
Measure finished dimensions, actual stock, openings, and site constraints before ordering material.
Railing layout
Lay out evenly spaced railing balusters from the clear opening, baluster width, and your maximum preferred gap. The result gives a count and equal spacing for field marking.
How the estimate works
The tool finds the smallest baluster count that keeps each equal opening at or below the chosen maximum gap, then reports the final edge and between-baluster spacing.
Measure finished dimensions, actual stock, openings, and site constraints before ordering material.
A maximum gap is a safety and code matter. Verify the correct limit, rail geometry, attachment method, and local requirements for your project before installation.
Use the related calculators below to turn a first estimate into a material list, layout, or a more detailed project plan.
FAQ
Use the maximum opening required by the applicable local code; many residential projects use a value below 4 inches, but rules and measurement methods vary.
No. It is for a straight clear opening. A sloped rail needs layout verification along the rail and local-code review.
Related tools
Free picket spacing calculator. Find fence picket quantity, equal gaps, and layout marks from fence length, picket width, and target gap.
Open Picket Spacing CalculatorFree deck cost and material calculator. Estimate decking boards, joists, fasteners, waste allowance, and a starting material budget.
Open Deck Cost & Material CalculatorFree deck stair calculator. Estimate deck stair risers, treads, rise, run, angle, and approximate stringer length for early layout planning.
Open Deck Stair CalculatorPlanning disclaimer: WoodCutTool results are estimates. Verify measurements, product instructions, material condition, local requirements, and safety practices before buying, cutting, or building.